Ver.1.0
Asprova My Schedule prior to ver. 1.5 does not support English as a display language.
Asprova My Schedule is a product that enables viewing production schedules scheduled by Asprova and entering actual performance data related to the schedule via a web browser.
Components of My Schedule
My Schedule consists of a plugin that uploads data from Asprova, a server (Asprova WS) that stores the data, a control panel to manage the server, and the My Schedule front-end displayed in a browser. For more details, please refer to the manual download page.
Free Plan / Standard Plan
My Schedule offers two plans: a Free Plan, which is available for use at no cost, and a Standard Plan. In the Standard Plan projects, in addition to all the features available in the Free Plan, it is possible to enter actual performance data on My Schedule and import this data into Asprova.
The following additional features are available in Standard Plan projects:
- The period for uploading data from Asprova becomes unlimited (in the Free Plan, it is limited to two weeks).
- Actual performance data can be entered on My Schedule and imported into Asprova.
- The number of simultaneous connections, which is fixed at 1 in the Free Plan, increases to 5. Additional simultaneous connections can also be purchased (for a fee).
- The Manufacturing BOM Table can be utilized.
Available UIs
Six UIs are available: Resource Gantt Chart, Dispatching View, Operation Table, Order Gantt Chart, Order Lead Time, and Manufacturing BOM Table. The Manufacturing BOM Table is available only in Standard Plan projects.
Resource Gantt Chart
In the Resource Gantt Chart, you can view the scheduled tasks for each resource. Similar to Asprova's Resource Gantt Chart, it displays connection lines between tasks in sequential processes and setup times. Based on user feedback regarding the overlapping text in Asprova's instruction bars making it difficult to read, we have added a panel on the right to display the currently selected tasks vertically.
You can enter the actual start and end times of tasks in the right panel. The entered data will be reflected in other UIs such as the Assignment View.
Similar to Asprova, tooltips can be displayed when hovering the mouse over an item.
Dispatching View
In the Dispatching View, you can view the assignments for each resource. By uploading data via the plugin, the styles from Asprova can be applied. You can enter the actual start and end times of tasks. The entered data will be reflected in other UIs such as the Resource Gantt Chart.
Operation Table
In the Operation Table, you can view a list of tasks. You can enter the actual start and end times of tasks. The entered data will be reflected in other UIs such as the Resource Gantt Chart.
Order Gantt Chart
You can view the Order Gantt Chart. The style of Asprova's Order Gantt Chart can be applied. Similar to Asprova, orders that are delayed can be displayed in red.
Manufacturing BOM Table
In the Manufacturing BOM Table, you can view the Manufacturing BOM. A Standard Plan is required to use the Manufacturing BOM Table.
For the Manufacturing BOM instructions, you can measure and update the manufacturing time.
Order Lead Time
In the Order Lead Time UI, the lead time for each order can be displayed in an easy-to-read graphical format.
Project Management
On the Asprova WS server, Free Plan projects can be created without any limit on the number of projects. The number of Standard Plan projects that can be created is determined by the license.
For each project that is created, you can finely configure which UIs to use and which users are able to view the project or input actual result data.